Part of the Indonesia Honda painting line project undertaken by our company has started shipping today
2018-12-20
The 7th 5th Council Enlarged Meeting of China Enamel Industry Association (Members' Meeting) was held in Foshan, Guangdong from December 8 to 9, 2018. Our general manager Mr. Zhu Haixiao and his party attended the meeting.

★2018.12.17★


In September 2018, our company successfully won the bid for the Indonesia Honda painting production line project with its strong comprehensive strength, advanced technical solutions and reasonable prices. After taking over the project, our company quickly established a project team composed of the company's core technical engineers. Adhering to the concept of customer first, actively using the most advanced technology in the industry, relying on its own highly professional technical capabilities, and taking every customer requirement as the criterion. Under the efficient operation of our company's design, procurement, production and manufacturing teams, through everyone's concerted efforts and tacit cooperation, the equipment of the Indonesia Honda painting production line project began to be loaded on December 17, and a satisfactory answer was given to customers on the premise of ensuring safety, quality and efficiency.

★Packaging the goods ready for shipment★

★Orderly delivery site★

news list
Recommended news
2025-10-09 16:59
TIMS Powder Coating Line Helps Haier's. Thailand Air Conditioner Production Capacity Increase During The China'a National Day Holiday
TIMS Powder Coating Line Helps Haier's. Thailand Air Conditioner Production Capacity Increase During The China'a National Day Holiday
2025-10-07 15:18
Family and Nation Celebrate as One; Both People and Moon Are Complete
Family and Nation Celebrate as One; Both People and Moon Are Complete
2025-10-07 15:09
We share the same dream with our motherland
We share the same dream with our motherland
2025-10-07 14:51
The three-country project is ready and waiting for shipment (truck)
The three-country project is ready and waiting for shipment (truck)
share to